RECENT PROJECTS

A1 Sosnica - Macejov "Gliwice" motorway

Location: Poland
Type of construction:
  construction of motorway, A1 section
Construction Period:
  2011 - up to now
Volume: 1,3 mil. €

Characteristics of work undertaken: implementation of bridge objects
Characteristics of construction: implementation of the bridge by a technology of bearing structure extrusion

A4 Wiezel Wielicka –Wiezel Brzesko / Bochnia motorway

Location: Poland
Type of construction:
  construction of motorway, A4 section
Construction Period:
 2011 - up to now
Volume:  1,0 mil. €

Characteristics of work undertaken: delivery of the bridge objects and culverts
Characteristics of construction: bridges on the A4 motorway from km 455+900.00 up to km 479.00

A4 Rzeszow (Wschodni) up to Jaroslaw (Wierzbna) motorway

Location: Poland
Type of construction:
  construction of motorway, A41 section
Construction Period:
  2011 - up to now
Volume:  3,6 mil. €

Characteristics of work undertaken: delivery of the bridge objects
Characteristics of construction: motorway construction from km 581+250.00 up to 622+450.00 km. WA-3 viaduct of the A4 motorway km 613+703.14

KAJAL welfare services facility

Location: Galanta
Type of construction:
  residential building
Construction Period:
  2011 - up to now

Characteristics of work undertaken: implementation of turnkey building object
Characteristics of construction: construction of facility

Vijzelgracht metro in Amsterdam

Location: The Netherlands
Type of construction:
  construction of underground railway station
Construction Period:
  2010 - up to now

Characteristics of work undertaken: implementation of building works 32 m below sea level. The construction works were partially carried out under the atmospheric pressure of 1,4 bar
Characteristics of construction: works in safety cabins for compressed air and activities connected with compressed air

FRANCE production line

Location: Guegnon, France
Construction Period:
  2010 - up to now

Characteristics of work undertaken: implementation of building works, fundaments for the anchoring of machinery for the new production line of the ACELOR MITTAL company
Characteristics of construction: construction of fundaments for anchoring the machinery

Construction of bridge over the Gulf of Bothnia near the town of Sundsvall (about 375 km north of Stockholm)

Location: The Gulf of Bothnia near the town of Sundsvall
Type of construction:
  Construction of bridge over the Gulf of Bothnia near the town of Sundsvall
Construction Period:
  07/2012

Characteristics of work undertaken: joint implementation of monolithic pillars for steel bridge deck with German company
Characteristics of construction: construction of bridge over the Gulf of Bothnia near the town of Sundsvall

Biogas station

Location: Nova Ves nad Zitavou
Type of construction:
  Biogas station in Nova Ves nad Zitavou
Construction Period:
  06/2012

Characteristics of work undertaken: implementation of circular reinforced-concrete structures (reservoirs - 11 pcs) with a diameter of 36 m, 22 m, 10 m with reservoirs heights of 3 m up to 8 m
Characteristics of construction: building of biogas station in Nova Ves nad Zitavou

Le Marin administrative building in Norroy Le venuter

Location: France
Type of construction:
  administrative building
Construction Period:
  11/2011 - 05/2012

Characteristics of construction: construction of the Le Marin administrative building in Norroy Le venuter

Devínsky dvor (Devin courtyard) polyfunctional building

Location: Bratislava
Type of construction:
  Devinsky dvor - Devinska Nova Ves housing complex, B2.1 and B2.2 objects
Construction Period:
  03/2012

Characteristics of work undertaken: implementation of bearing reinforced-concrete structure with circumferential backing masonry
Characteristics of construction: implementation of bearing reinforced-concrete structure

Milan Rastislav Stefanik's airport

Location: Bratislava
Type of construction:
  terminal
Construction Period:
  2011

Characteristics of work undertaken: implementation of bearing monolithic structures
Characteristics of construction: reconstruction and terminal extension

Horovce biogas station

Location: Bierovce and Horovce
Type of construction:
  Horovce biogas station
Construction Period:
  11/2011

Characteristics of work undertaken: implementation of circular reinforced - concrete structures (reservoirs - 7 pcs) with a diameter of 32 m, 22 m, 13 m with reservoirs height of 1,9 m up to 8 m
Characteristics of construction: construction of Bierovce and Horovce biogas station

Velke Bierovce biogas station

Location: Bierovce and Horovce
Type of construction:
  Bierovce biogas station
Construction Period:
 09/2011

Characteristics of work undertaken: implementation of circular reinforced - concrete structures (reservoirs - 6 pcs) with a diameter of 36 m, 22 m, 10 m with reservoir height of 3 m up to 6 m
Characteristics of construction: construction of Bierovce and Horovce biogas station

Construction of northern bypass of Banska Bystrica

Location: Banska Bystrica
Type of construction:
  abutment walls
Construction Period:
   2010 - 2011

Characteristics of work undertaken: construction of the northern bypass of Banská Bystrica - of the R1 expressway - abutment walls
Characteristics of construction: retaining and abutment walls of reinforced concrete

Polyfunctional building on Obchodná street in Bratislava

Location: Bratislava
Type of construction:
  polyfunctional object
Construction Period:
   2010 - 2011

Characteristics of work undertaken: implementation of turnkey reinforced - concrete building object
Characteristics of construction: reconstruction and superstructure

France

Location: Batilli, France
Construction Period:
    2010

Characteristics of work undertaken: implementation of building works upon the construction (extension) of new production line, the works were carried out during the production

France

Location: Ars sur Moselle / Metz, France
Construction Period:
    2010

Characteristics of work undertaken: implementation of reinforced - concrete monolithic structure of housing object

Polyfunctional building PASSAGE

Location: Trenčín
Type of construction:
  polyfunctional building
Construction Period:
   2008 – 5/2009
Volume:  2,8 million €

Characteristics of work undertaken: turnkey implementation
Characteristics of construction: 17 luxury housing units with garages and passage
Photos: completed project

Residential complex Panorama

Location: Trenčín
Type of construction:
  residential complex
Construction Period:
  2008 - 11/2009
Volume:  1,92 million €

Characteristics of work undertaken: turnkey implementation
Characteristics of construction: 29 flats with garages in the basement area
Photos: construction of the building

Highway bridge over Považská Bystrica

Location: Považská Bystrica
Type of construction:
  the D1 motorway bridge
Construction Period:
  02/2009 – 05/2010
Volume: 0,358 million €

Characteristics of work undertaken: rocker. No 8 – the first construction of this type of structure in Slovakia realized cantilever method.
Characteristics of construction: the structure obtains a bridge height 28 meters, 30 meters width for two lanes
Photos: building construction

Bridge at the route R1 Žarnovica - Šášovské podhradie

Location: Žiar nad Hronom
Type of construction:
  highway bridge
Construction Period:
  07/2009 – 05/2010
Volume: 0,38 million €

Characteristics of work undertaken: framework foundation and additional concreting
Characteristics of construction: the upper structure created by combining monolithic and prefabricated wings
Photos: building structure

Wholesale Center JUST PLAY

Location: Bratislava
Type of construction:
  warehousing and distribution halls, administrative buildings
Construction Period:
  12/2008 – 4/2009
Volume: 2,2 million €

Photos: construction of the building

Reconstruction of the Ice Rink O. Nepela

Location: Bratislava
Type of construction:
  Reconstruction of Ice Ring
Construction Period:
  6/2009 – 11/2010
Volume: 3,4 million €

Characteristics of work undertaken: building shell production for main contractor Ingsteel Ltd.
Photos: Detail of reconstruction, the total reconstruction

Reconstruction and extension M. R . Štefánik Airport Terminal

Location: Bratislava
Type of construction:
  výstavba terminálu
Construction Period:

Tubau Zeda Holding Danicon Development
© 2009 DOPRASTAV EXPORT s. r. o. All rights reserved